Project Gallery - Commercial
Carmike Cineplex 20
The scope involved the HVAC systems serving an approximately 150,000 sq. ft. facility with 20 screens, common area, concession area, and an equipment mezzanine.
View the complete gallery here.
Channel 58
The scope of work included complete design and construction for the heating ventilation and air conditioning systems for the television station.
View the complete gallery here.
Lipscomb Arena
This state-of-the-art arena can seat 5,750 people depending on the event. The cooling plant consists of two 250 ton water cooled chillers, four 25,000 cfm airhandling units, 70 variable air volume boxes and a steam to heating hot water heat exchanger.
View the complete gallery here.
Primus
This project consisted of the design and construction of the HVAC and plumbing systems for a 550,000 sq. ft. office complex, designed and constructed in two phases.
View the complete gallery here.
Southern Ice
This facility required design and installation of the plumbing, mechanical and HVAC systems for a twin pad ice skating rink with common areas.
View the complete gallery here.
Tennessee Titans
Lee Company’s scope of work included the design and construction services for the 77,500 sq. ft. NFL training facility. This facility includes a complete exercise facility, administrative offices, planning rooms, auditoriums and a full kitchen.
View the complete gallery here.
