Donuts are delightful. Baking donuts? That can be messy. To ensure the Maplehurst bakery met FDA wash-down requirements, Lee Company replaced the plant’s extensive hot water system, tripling the facility’s hot-water capacity. The on-site work – including all piping connections, flue connections, electrical and startups – was completed over five days, without interrupting plant operations. Lee Company also provided design/build services for a new frozen dough line, allowing the bakery to expand business with shipments throughout the country. This work included setting four DX AAON rooftop units in place in four hours to minimize disruptions. You do not delay donuts!
23,060 square feet
Duration: 7 months
Scope of Work:
- Installing 70-ton, 25-ton, 4-ton, and 6-ton packaged AAON units with 42 degree F leaving air temperature, 100% economizer, and hot gas reheat for dehumidification
- Replacing domestic hot water boiler with new 10 MMBTUH boiler to provide 12,000 GPH hot water, transfer pump skid, distribution pump skid, backflow preventer, and flue gas piping
- Installing 10 stainless steel washdown hose stations, 6 new stainless steel two-compartment sinks, 15 additional drains and associated piping
- Installing aluminum compressed air piping for frozen conveyor line
Awards: ABC Award Winner