After Lee Company exceeded job expectations in 2019 for a processing plant in Bowling Green, Kentucky – a customer that will simply be referred to as “BG” for privacy purposes – the team was awarded another opportunity to provide the exact same services on an identical project (BG2) in 2022. Rather than choosing to coast or ride the current of their previous work, Lee Company resolved to make improvements. Taking on a challenging mechanical job as well as a tight customer deadline, Lee Company’s bright and seasoned plumbers brought perceptive, game-changing ideas to the table – and made waves.
Square Footage:
100,000 square feet
Duration: 3 months (May – July 2022)
Scope of Work:
- Design-build, mechanical and plumbing
- Adding a 5-story tower to an existing water processing plant
- Adding an entire tower inside the pre-existing building and five floors of process equipment
- Welding 6 inch, 4 inch, 3 inch, and 2 1⁄2 inch pipes
- Working in enclosed spaces with a high level of difficulty