Lee Company was awarded this project at Cummins Inc. in March of 2012, and was the lead prime contractor to coordinate all work to be performed. Lee Company facilitated the coordination of sprinkler, electrical, structural steel, and roofing contractors.
Square Footage:
16,000 square feet
Duration: 4 months
Scope of Work:
- Demolition of approximately 5,700 pounds of ductwork, 12,000 pounds of rooftop equipment, and 204 linear feet of pre-engineered modular exposures
- Installation of (3) 95-ton rooftop units and relocation of an existing 15-ton rooftop unit
- Modifications to existing process ductwork to accommodate new process exhaust systems
- Installation of (3) 24" process exhaust systems to remove the process heat from the space to control temperature and humidity
- Connection and extension of the existing Reliable Controls system, operating the Cummins Filtration chiller plant