If it weren’t for technology, Lee Company might still be working on its first design-build project for Claborn Manufacturing in North Alabama: The structural measurements provided were wrong. Fortunately, Lee Company conducted its own 3D scan. That data helped shape a detailed, virtual model, and the fab shop team created 40-foot plumbing and mechanical racks that fit perfectly. Technology and teamwork went hand-in-hand throughout this nearly $4.9 million project: Everyone pulled together to get this industrial makeover done right. With more Claborn jobs now underway, this project is a huge success for North Alabama, no matter how you measure it!
Square Footage:
330,000 square feet
Duration: 10 months
Scope of Work:
- Complete rebuild of an existing facility. Lee Company handled design-build, with responsibility for mechanical, plumbing, sheet metal and controls
- BIM design
- Prefab and installation of (8) bathroom batteries
- Prefab of pipe racks; roughly 3,000 feet of pipe were installed in the first two weeks
- Installation of (30) vertical racks, 42 feet in length
- Installation of (80) horizontal racks, 20 feet in length
- Installation of (2) 115-ton, (1) 40-ton Air Rotation Units
- Installation of (13) RTU’s, (8) 10-ton, (4) 25-ton, (1) 17.5-ton
- Installation of (2) 950,000 BTU Direct Gas Fired, Blow-Thru Heaters
- Installation of (5) Mitsubishi Mini-Splits
- Installation of (2) 200-ton Trane Chillers
- Installation of (1) 60-ton Make up air unit
- Installation of (5) sanitary lift stations
- Installation of (95) various plumbing fixtures
Awards: ABC Award Winner